
Turmeric Spent Marc Turmerone (CO₂)

Turmeric Spent Marc Turmerone (CO₂)
Extraction Technologies
Mechotech designs and manufactures turnkey extraction plants that process turmeric spent marc to recover residual turmerones. We supply the machinery for the route selected after screening — raw-material preparation, extraction, separation, concentration or recovery, and drying or collection — configured to the target specification. Mechotech's technology screening identifies one candidate route for this feedstock: Supercritical CO₂ Extraction (SCFE) (exploratory screening, rank 96 of 100 in that technology's screening).
For turmeric spent marc with residual turmerones as the target, there is one candidate technology: Supercritical CO₂ Extraction (SCFE). By route — Supercritical CO₂ (SCFE): exploratory screening, rank 96 of 100, CO₂; optional ethanol modifier. For the best-ranked route, Supercritical CO₂ (SCFE), the screening flags: nonpolar fraction preferred; polar targets may need modifier and separate validation. These are screening candidates rather than guarantees: the final technology, operating parameters and plant configuration are established during process development and pilot validation. Product-contact parts are built in SS 316L with CIP-cleanable design, and automation is configured to the project.
Technical Specifications
| Product | Turmeric Spent Marc Turmerone (CO₂) Extraction Plant |
|---|---|
| Feedstock | Turmeric spent marc |
| Part / Feed Form | Spent marc |
| Target Extract | Residual turmerones |
| Extraction Method | CO2 |
| Technology Count | 1 |
| Product-contact Material | SS 316L, electropolished, CIP-cleanable |
| Automation | PLC-SCADA, configured to requirement |
Plant Capacities
| Plant Scale | Raw Material Throughput | Typical Use |
|---|---|---|
| Pilot | Configured to your feedstock and trial plan | Product development, parameter validation |
| Semi-Commercial | Configured to raw-material supply and buyer volume | Contract manufacturing, scale-up trials |
| Commercial | Configured to raw-material supply and confirmed buyer volume | Commercial production at confirmed buyer volume |
Capacity is configured to raw-material supply and confirmed buyer volume; we recommend a pilot plant to validate process parameters before scaling. No fixed throughput is quoted for this product.
Manufacturing Process
Each extraction method follows a different process — pick a method to see its steps.
Raw-Material Conditioning
Turmeric spent marc is cleaned and conditioned so residual turmerones are accessible to supercritical CO₂; moisture and particle size are set during process development.
Extraction Vessel Loading
Conditioned turmeric spent marc is charged into the high-pressure extraction vessel.
Supercritical CO₂ Extraction
Supercritical CO₂ passes through the charge and dissolves residual turmerones; an ethanol modifier can be evaluated where polar fractions are also required, and operating pressure and temperature are set in process development.
Separator Collection
Pressure is reduced in separator stages so the extracted residual turmerones drop out of the CO₂ and are collected.
CO₂ Recycle
Gaseous CO₂ is re-liquefied and recirculated to the extractor, limiting make-up gas demand.
Finishing & Packing
The collected residual turmerones are polished by filtration as needed and packed to the required specification.
Major Plant Equipment
- Raw-material cleaning and size-reduction system
- Supercritical CO₂ extraction vessels
- CO₂ pump, heat exchangers and chiller
- Separator vessels
- CO₂ recovery / recycle system
- Optional ethanol-modifier dosing skid
- Product collection vessels and polish filtration
- CIP (clean-in-place) system
- Storage and finished-product tanks
- PLC-SCADA control panel and instrumentation
Plant Output
Applications
- Aromatherapy, fragrance, perfumery, and flavour applications — Turmeric Spent Marc Turmerone (CO₂)
- Pharmaceutical standardised ingredient supply — Turmeric Spent Marc Turmerone (CO₂)
- Nutraceutical capsule, tablet, and supplement manufacturing — Turmeric Spent Marc Turmerone (CO₂)
- Food, flavour, and beverage applications — Turmeric Spent Marc Turmerone (CO₂)
- Export to regulated-market ingredient buyers — Turmeric Spent Marc Turmerone (CO₂)
Key Features
Supercritical CO₂ (SCFE) — Exploratory Screening Fit
Best-ranked route for turmeric spent marc: rank 96 of 100 in Mechotech's supercritical CO₂ extraction screening, using CO₂; optional ethanol modifier. Ranks are directional screening priorities, not measured yield, ROI or plant guarantees.
Single Candidate Route
Routes screened for turmeric spent marc: Supercritical CO₂ (SCFE) — exploratory, rank 96. The process tab above shows the steps for this route.
Spent marc Feed Form
The candidate routes are defined for turmeric spent marc; feedstock assay and moisture are measured as pilot inputs and the feed form is set during process development.
Parameters Fixed After Pilot Trials
Recovery of residual turmerones, selectivity, solvent or water duty, quality and cleaning are measured in pilot trials, starting with small-scale feed trials, before final plant parameters are fixed.
SS 316L Hygienic Construction
Product-contact surfaces are SS 316L and CIP-cleanable, in a hygienic design suited to food, nutraceutical and pharmaceutical supply chains; PLC-SCADA automation with recipe control can be configured to the project scope.
Frequently Asked Questions
What is a turmeric spent marc extraction plant for residual turmerones?
Which plant part or feed form does the turmeric spent marc plant process?
Which extraction technology is suitable for turmeric spent marc?
How does Mechotech's screening rank the candidate route for turmeric spent marc?
How does the turmeric spent marc extraction process work?
What equipment does the turmeric spent marc extraction plant include?
Why is supercritical CO₂ a candidate technology for residual turmerones?
What output and specification can the turmeric spent marc plant deliver?
What application areas are listed for Turmeric Spent Marc Turmerone (CO₂)?
Which related Mechotech extraction pages cover the same material or target?
What capacity is available and is a pilot trial recommended?
Ready to discuss your project?
Get a free quote and technical consultation from our engineering team.